Kitchen and wardrobes, Saradise
Built-in kitchen, island and four bedroom wardrobes made to the measured openings, with a stone worktop and concealed lighting.
- Location
- Saradise, Kuching
- Property
- Semi-detached
- Completed
- November 2025
- On site
- 5 weeks
- Service
- Kitchens, wardrobes and built-in joinery
BeforeAfterDrag the handle, or use the arrow keys, to compare before and after.
The job
None of the walls in the kitchen were parallel — normal in a house of this age, and the reason a modular kitchen would have finished with a visible taper at the end of the run.
Everything was measured on site after the strip-out and built to those dimensions. The worktop was templated after the carcasses were installed rather than from the drawing, which is the only way to get a stone joint that closes.

