Skip to content
NATHFRA GROUP
Restored heritage shophouse terrace along the Kuching waterfront at blue hour, timber shutters and carved fretwork lit from within.

Kuching, Sarawak

Renovation contractors in Kuching, from first wall to final coat.

NATHFRA GROUP renovates terrace houses, shophouses and offices across Greater Kuching. Every trade runs under one contract and one site supervisor, so there is one schedule, one price and one person to call.

CIDB
Registered with the Construction Industry Development Board
UPKJ
Registered contractor, Sarawak
MOF
Registered with the Ministry of Finance Malaysia

How it runs

One contract, one supervisor, one number to call.

  1. 01

    Site visit

    We come and look at the property. Age, structure, wiring, roof, where the water goes — the things that decide what a renovation actually costs.

  2. 02

    Itemised quote

    A written quote broken down by trade, not one number for "renovation". You can see what each part costs and take parts out if the budget needs it.

  3. 03

    Contract and programme

    Fixed scope, fixed price, dated programme and staged payments tied to work completed rather than to the calendar.

  4. 04

    On site

    One supervisor owns the site from strip-out to final coat. You get progress photographs and you call one number, not six subcontractors.

  5. 05

    Handover and defects

    Joint inspection, snag list cleared, then a defects liability period during which we come back and fix what emerges.

Questions

Questions we get asked

How do I check that a renovation contractor is really registered?

Ask for the CIDB registration and the SSM company number and check them yourself — CIDB runs a public contractor search and SSM records show whether the company exists and who owns it. In Sarawak, contractors also register with UPKJ. NATHFRA GROUP (M) SDN. BHD. is registered with CIDB, with UPKJ and with the Ministry of Finance Malaysia; we give the registration numbers and the CIDB grade in writing before a contract is signed rather than publishing them on a page where they cannot be checked against the certificate.

Do I need council approval to renovate a house in Kuching?

Internal renovation that does not touch the structure normally does not. Extensions, structural alterations, a new car porch, a raised boundary wall or anything that changes the building footprint normally does, and the submission goes to whichever authority your address falls under — DBKU for Kuching North, MBKS for Kuching South, or Padawan Municipal Council outside the two city areas. We arrange the drawings and the submission as part of the contract.

How long does a whole-house renovation take?

A single room such as a kitchen or a bathroom is usually a few weeks. A full strip-out and refit of a terrace house typically runs two to four months, depending on whether the roof, the wiring and the plumbing are being replaced. The programme is dated in the contract before work starts, so the schedule is something you can hold us to rather than an estimate given over the phone.

Which areas around Kuching do you cover?

We work across Greater Kuching — Saradise, Stutong, Tabuan Jaya, Batu Kawa, Matang, Petra Jaya and Kota Samarahan — and take work further out in Siburan, Bau and Serian by arrangement. Our office is at Block B2 Saradise, Jalan Saradise.

Should I hire an interior designer or a renovation contractor?

A contractor builds to a plan you already have; a designer produces the concept, the visuals and the material selections and then manages the trades, which in Malaysia typically adds 30–60% to the same scope of work. If you know roughly what you want, or you already have drawings, going direct to a contractor is cheaper. We build from your drawings, from your designer’s drawings, or from a sketch and a list of what each room has to do.

Can we stay in the house while the work is going on?

Sometimes. If the work is confined to one floor or to the rear of the house it can be phased so you keep a kitchen and a bathroom in use. A full rewire or a re-roof means moving out for that stage — we will tell you which it is at the quote, not halfway through.

What happens if something goes wrong after handover?

Handover is a joint inspection with a snag list, and the snags are cleared before the final payment is released. After that a defects liability period runs — commonly six to twelve months for renovation work, set in the contract — during which we come back and fix what emerges at no charge. The retention sum is held until it ends, which is what makes coming back worth our while rather than a favour.

Get in touch

Tell us about your renovation.

Send a few photographs and the address, or call and we will arrange a site visit. Quotes are free and itemised.